Skip to content

Northern Built

A Cold Climate Construction and Energy Blog

Tag: Rim joist

Posted on February 24, 2019February 24, 2019

My Cape-Office Build-Out

We moved into my 1952 Cape last December.  Winter was upon us, no time or desire to start any of the major renovation and energy updates I have planned.  My office was moved temporarily into the extra basement bedroom with a plan to build-out a new office adjacent to the bedroom. Continue reading “My Cape-Office Build-Out”

About This Site

Welcome to Northern Built, where we discuss building science, construction techniques, and energy for homes built in a cold climate.

Reach me at: northernbuiltpro1969@gmail.com

Sign up to be notified when new blog posts are published.

Loading

Search

Categories

  • 1952 Cape (8)
  • Barndominium Project (6)
  • Building Diagnostics (3)
  • Building Science (37)
  • Case Study (4)
  • Code (6)
  • Code Minimum House (3)
  • Construction Design (62)
  • Construction Education (6)
  • Construction Materials (30)
  • Diagnostic Tools (8)
  • Energy Audit (30)
  • Energy Conservation (2)
  • Mechanicals (14)
  • Opinion (4)
  • Shorts (17)
  • Testing (5)
  • Uncategorized (2)

Popular Posts

  • Facebook
  • Twitter
  • Instagram
Proudly powered by WordPress